Description
METALLIC FLOORCOATING, it is a low viscosity, solvent-free, self-leveling, multi-purpose indoor flooring material that provides unique decorative image thanks to its two-component, reflective pigments and aesthetic effects. It is easy
to apply, provides a glossy metallic surface, is water-impermeable and hygienic, easy to clean. It is resistant to mechanical loads, wear and chemicals. Suitable for use on all interior surfaces such as concrete, ceramic, marble, mosaic, steel,
glass, etc..
USAGE AREAS
· Showrooms, offices, houses, shopping malls
· All kinds of ceramic, concrete, marble, mosaic, wood, steel surfaces,
· Laboratory, food, chemical and pharmaceutical industries,
SUITABLE FOR INDOOR USE ONLY.
PROPERTIES
· Provides decorative and a glossy finish.
· Resistant to friction, impact, and abrasion. Easy and pratic to clean.
· It can be applied quickly and easy, easy to maintain. It has high adhesion properties.
· Solvent-free. It has excellent penetration.
APPLICATION INFORMATION
Surface Preparation : Application surfaces should be clean, dry, and free of all oil, dirt, dust and surface wastes. Before application of ISONEM Metallic Floor, in concrete, marble, granite, raw wood, tile, ceramic etc. surfaces, ISONEM EP
Primer should be used as a primer with 0,250 - 0,400 kg/m² consumption. In steel/metal surfaces, the surfaced should be primed with ISONEM Anti Rust Primer (Anticorrosive primer), consumption of 0,250 - 0,350 kg/m².
Preparation of the mixture : ISONEM METALLIC FLOOR is supplied in ready-to-use kits according to the mixing ratio. The mixture should be prepared to be applied according to the life of the mixture. Before starting to mixed, make sure
that the material temperatures are between 15 and 25°C. Component A should be thoroughly mixed with a mechanical stirrer at 300 - 400 rpm for 3 to 4 minutes without dragging air in it. Subsequently, all of component B must be poured
into component A and ensure that there is no material left inside the B component. A + B should be mixed for at least 3 minutes until a homogenous mixture is obtained and the prepared mixture should be consumed within 30 - 40 min.
Application Method : The mixture should be applied to the prepared surface by brush or roller. If the thickness is desired, the second coat should be applied after the surface drying of the first layer has been achieved. For the formation
of the metal effect and the decorative image, the desired metallic reflections can be given by the apparatus like a sponge, roller, epoxy roll, butterfly roll etc. within 1-2 hours after application of the product (when it has the consistency
that can take shape, close to drying.). The hard drying time is 18-24 hours. Full hardening and physical, chemical resistance in 7 days.
- flooring
- floor paint
- metallic
- epoxy
- epoxy resin
Production Capacity:
1000000
Delivery Timeframe:
Immediate
Incoterms:
CFR - Cost and Freight
CIF - Cost, Insurance and Freight
CIP - Carriage and Insurance Paid to
CPT - Carriage Paid to
DDU - Delivered Duty Unpaid
EXW - Ex Works
FCA - Free Carrier
FOB - Free on Board
Packaging Details:
5 kg set
More about
ISONEM PAINT AND INSULATION TECHNOLOGIES
50-100
Employees
50M - 100M
Sales volume (USD)
50%
% Export sales
Year
Established
Business type
- Industry / Manufacturer
Keywords
- paint
- coating
- waterproofing
- insulation
- wall paint
- roof insulation
- epoxy flooring
- flooring material
- roofing
- concrete insulation Ver Mais
Contact and location
- BEHIYE BASER
- +90 xxxxxxxx
- IZMIR / IZMIR | Turkey