Description
Product name plastic mold
Mold cavity Single cavity or multi-cavity
Mold steel S50C/P20H/718/H13/2738/S136/2344, etc
Steel hardness 28-50HRC
Mold frame LKM, DME, HASCO, homemade, etc.
Mold flowway hot/cold
Gate point gate, side gate, straight gate mode, secondary gate, label gate, fan gate
Top out of the release plate, top out of the block, top out of the sale, gas, cylinder
Mold Life 1,000,000 Shots different steels, different mold life
Production time is 30-50 days, depending on the product
Mold parts Chinese standard/SKD
Mold quality grade A quality (highest quality), B quality (intermediate quality), C grade quality (lowest grade quality), different
level of different prices
Note When you send us a mold inquiry, please provide the following information:
1) The quality level you choose: A/B/C
2) Photo with size/drawing design
Mold quality control for mold Q/C, there are 3 steps:
1. Mold material Q/C
- Mold steel inspection, standard preparation inspection
2. Mold production process Q/C
- Design inspection, according to 2D drawings after processing each part of the mold size inspection, mold testing
3. Check with the customer's request again before shipping the mold.
- Injection mold
- barrel mold
- lid mold
- knife and fork spoon mold
Production Capacity:
20
Delivery Timeframe:
Within 60 Days
Incoterms:
CIF - Cost, Insurance and Freight
FOB - Free on Board
Packaging Details:
wooden box
More about
Taizhou Wise Mould CO.,Ltd
10-50
Employees
500K - 1M
Sales volume (USD)
50%
% Export sales
Year
Established
Business type
- Industry / Manufacturer
Keywords
- Injection mold
- bottle cap mold
- paint barrel mold
- pipe mold
- plastic mold
Contact and location
- Sissi Ren
- +86 xxxxxxxx
- taizhou / zhejiang | China