Description
The unit is designed for transportation of chemical reagents to the work site and dosing them during the process of hydraulic fracturing.
Components:
Chassis
Container-type body
System of chemical tanks
System for handling chemicals
System for washing and blasting the pumps, pipelines and hoses
Hydraulic system
Pump for supplying chemicals from external tanks
Heating system
Electrical equipment
Drums with hoses
Control and measurement devices
System of internal and external lighting
Remote Control
Specifications
Number of chemical reagents, pcs: 6
Number of chemical reagents tanks, pcs: 6
Tank volume, L: 2000
Tanks material: Stainless steel
Number of dosing pumps, pcs: 12
Rated flow of 4 dosing pumps, pcs: 12
Rated flow of 4 dosing pumps, L/min: 1-30
Rated flow of 6 dosing pumps, L/min: 1-20
Rated flow of 2 dosing pumps for breaker, L/min: 0,1-1
Number of flowmeters, pcs: 12
Generator power, kW: 30
Operating temperature range, degrees C: -40 - +40
- dosing chamicals
- dispensing chemicals
- hydraulic fracturing
- fracking
Production Capacity:
Not informed
Delivery Timeframe:
Not informed
Incoterms:
Not informedPackaging Details:
Not informed
More about
TRUST-ENGINEERING LLC
Not informed
Not informed
Not informed
Year
Established
Business type
- Industry / Manufacturer
- Importer / Trading Company
Keywords
- hydraulic fracturing
- coiled tubing
- high-preasure triplex plunger pumps
- units for cementing
- units for heating
Contact and location
- Natalya Fokina
- +7 863 xxxxxxxx
- Rostov-on-Don / | Russian Federation